Erosion control device details 5. Top. Other sheets may also require original seals. These details could include materials used, sizes, spans, and dimensions. If you are unsure of what is required please consult a professional designer. Generally permits will require the following drawings; Site Plan Permit Intake and Application Requirements for all Building Permits. We're still working on this page's design and content. A building evaluation may have to be done to make sure that the existing building can support the proposed use. Building permit application – If you are building a new home or remodeling an existing home, chances are you will need a building permit. To sketch the floor plan, each 1/8 is equal to 1 foot. This ensures that your project aligns with all municipal bylaws and regulations, as well as BC Building Code requirements. To make sure you fill out the application form correctly, review the residential building permit application form requirements. Incomplete applications cannot be accepted. 2. This information is generally available from the mechanical/heating contractor. An E-Plan invitation with instructions for uploading drawings will be emailed to the Applicant approximately 48 hours after the building permit application is completed online. Sketch additional pages to meet requirements specific to your project. An architect or draftsperson who prepares architectural and structural drawings for a Building Permit application needs to make sure the drawings include all the required details. Building Permit Application Form; Preliminary Planning Review Form (Contact the Planning Department) Copy of a Site Plan; Construction Plans; Property Declaration Form; Permit Processing Fee; Required supporting documents: Truss Layout; Engineering schedules and/or reports; Home Warranty Insurance (LCS) Septic Filing (from ROWP & accepted by VIHA) … Building Designer’s statement of roof truss system coordination with: Architectural/structural drawings using an engineered roof truss system, Roof truss specifications from the manufacturer/supplier bearing the seal and signature of an Ontario registered Professional Engineer, All existing buildings and accessory structures labelled “existing”, Typical accessible parking space dimensioned, “Gross floor area (GFA) Non-Residential” figure (meters squared) with breakdown of each floor, Number of parking spaces required and parking rate, Number of accessible parking spaces required, Identifying the use and size of all rooms and spaces, identifying all proposed fire separations, partition and door schedules, all necessary construction details for proposed construction including fire-rated assemblies, providing design criteria, construction details and specifications, Providing distribution system plan including unit location and specification, duct size and volume, fire dampers and fire stop flap locations, Providing proposed fixtures and a drain plan indicating the pipe size, Providing the location of all required exit signs and emergency lights. The sheet/drawing name must identify the floor(s) or similar pertinent information, such as: General (symbols legend, notes, etc. Call your municipal building department to … When you need to apply for a building permit. Building departments differ greatly in their requirements. When you upload all of these drawings and documents into the ePlans portal, all files must: Do not include the address, date, business name, underscores or any other special characters in the file names. Drawings must be to scale, and should use metric measurements. Along with the filled out forms and required documents as outlined in the checklist, submit them to the Office of the Building Official. Specifically, a permit is required when you are: 1. STRUCTURAL PEER REVIEWER’S REPORT. All plans must: 1. PLAN REQUIREMENTS. All drawings submitted for building permit application are required to be prepared by the listed homeowner or by a qualified designer, architect or professional engineer or a combination thereof. Please anticipate the longer response times. Building a new structure that is larger than ten metres squared (108 square feet). For a smoother permit application process, please check that you have all the information using our checklists before applying for your permit. Energy Calculations - A mechanical contractor or project architect must sign the owner/agent certific… Building Permit plan requirements PDF: Plan requirements for building permit applications for new construction and additions. This is not a comprehensive list. You must follow these rules when you apply for a permit online that requires you to upload plans. Diversity, inclusion, accessibility & immigration, Report a change to lot lines for your property taxes, Enroll in the Real Estate Tax deferral program, Set up a Real Estate Tax installment plan, Low-income senior citizen Real Estate Tax freeze, Set up an Owner-occupied Real Estate Tax payment agreement (OOPA), Get a nonprofit real estate tax exemption, Get a real estate tax adjustment after a catastrophic loss, Find a licensed contractor and contractor information, Save your home from mortgage and tax foreclosure, Apply for a grant to clear your home’s title, Services for people experiencing homelessness, Get a Vacant Residential Property License, Get home repairs and modifications for seniors, Apply for a low-interest home improvement loan, Report a problem with a building, lot, or street, Register a burglar alarm / Pay the annual fee, Use a Philadelphia Parks & Recreation space, Reserve a Parks & Recreation facility or field, Get a permit for a large event or festival, Get a Friends and community group event permit, Get a wedding ceremony or wedding photo permit, Get a dust control permit for construction and demolition, Submit a plan for handling infectious waste at a health care facility, Request a permit for a septic system or private sewer line, Submit lead certification and inspection reports, Register in eCLIPSE as a design professional or attorney of record, Submit as a PA Home Improvement Contractor to get construction permits, Get approval for construction in the floodplain, Get an Electrical Permit to install solar panels, Get a building permit for a tank to store hazardous materials, Get a Make Safe Permit for a dangerous building, Request a preliminary review of construction projects, Get a project scoping meeting for a multi-phased project, Get a Zoning Permit to adjust property lot lines, Get a Zoning Permit for new construction or additions, Get a Zoning Permit to change the use of a property, Appeal to the Board of Safety and Fire Prevention (BOSFP), Appeal a denied residential parking spot for people with disabilities, Appeal to the Board of Building Standards (BBS), Appeal to the Board of License and Inspection Review, Search for property history and business license information, Business licenses, permits, and approvals, Apply for or renew certification for a body art establishment, Schedule a sanitation/safety inspection for a child care facility, Schedule a sanitation/safety inspection for in-home child care, Apply to operate equipment that emits or controls air pollution, Apply to install equipment that emits or controls air pollution, Change ownership of a stationary food business, Change ownership of a mobile food business, Apply for a plan review for a stationary food business, Apply for a plan review for a mobile food business, Get a Food Preparation and Serving License, Get a Food Establishment Retail, Non-Permanent Location License, Get a Food Establishment Retail, Permanent Location License, Self-certify a food business for COVID-19 safety, Search tobacco retailer permit eligibility by neighborhood, Get a license to sell goods in special vending districts, Get a Dumpster License (Private or Right-of-Way), Get a Limited Engagement Small Games of Chance License, Get an Auto Wrecking Yard and Tire Storage License, Get a Fire Suppression Systems Contractor License, Get a Fire Suppression Systems Worker License, Get a Fire Suppression Systems Apprentice License, Get an Electrical Inspection Agency License, Apply to provide food or drinks at a special event, Get a Temporary Occupancy Permit for a special event, Get a copy of a license, permit, or violation, Report an unlicensed contractor or unpermitted work, Make an appointment to visit the L&I Permit and License Center, Ask the DHS Commissioner’s Action Response Office (CARO), Request DNA/paternity test information from the Medical Examiner, Find a minority, woman, or disabled-owned business, Report possible fraud, waste, or other issues on contracts, Find loans through the Philadelphia Business Lending Network, Meet your area’s business services manager, Find financial support and incentives for your business, Register as a minority, woman, or disabled-owned business, Bid on a Services, Supplies, and Equipment contract, Pay the fee for a professional services contract online, Apply for a Temporary No Parking (TNP) permit, File a complaint against a Philadelphia police officer, Recommend a police officer for commendation, Make an appointment at the Philadelphia Parks & Rec Historic Archive, Apply for a Philadelphia Activities Fund grant, Find Philadelphia Parks & Recreation activities, Enroll in a youth Parks & Recreation program, Nominate someone for a Mayor’s Day of Service Recognition Award, Find child care and early childhood education, Find an after school or summer program for children, Apply for the 911 program for people with disabilities, Learn how to get and use naloxone (Narcan®), Get the vaccines your child needs to start school, Get vaccinated (if you don’t have health insurance), Get vaccinated (if you have health insurance), Protect yourself from West Nile virus and Lyme disease, Planning guidance for businesses and nonprofit organizations, Get emergency treatment (PEP) after recent exposure to HIV, Get walk-in testing and treatment for STDs, Get support for a child with special health care needs, Get directly observed therapy (DOT) for tuberculosis, Apply for an Urban Health Policy Fellowship, Submit a study to the Health Commissioner’s Office Review Committee, Report an infectious disease (for health care providers), Submit a research study to the Institutional Review Board (IRB), File a complaint about a medical provider, File a complaint about a medical facility, File a water quality complaint for a swimming pool, File a complaint about a child care facility, File a complaint about a barber shop or beauty salon, Report a food illness or food safety concern, Volunteer for the Philadelphia Medical Reserve Corps (MRC), Understand the PBT notification-confirmation process, Set up an Owner-occupied Real Estate Tax Payment Agreement (OOPA), Set up a Real Estate Tax payment plan for property you don’t live in, Set up a payment agreement for your business or income taxes, Owner-occupied Real Estate Tax payment agreement, Get help if you are at risk of being evicted, Community Development Corporation (CDC) Tax Credit, Life Partner & Transgender Care Health Benefits Tax Credits, Philadelphia Re-Entry Program (PREP) Tax Credit, Earned Income Tax Credit (EITC) resources, Low-income Senior Citizen Real Estate Tax Freeze, File and pay Business Income & Receipts Tax (BIRT), Resolve business and income/Wage Tax liens and judgments, Resolve bills or liens for work done by the City on a property, Use code enforcement numbers to request a payoff, Make an appointment to pay City taxes or a water bill in person, Refunds for taxes paid to local jurisdictions, Appeal a water bill or water service decision, Enroll in direct deposit as a vendor or a foster parent, Get free help applying for public benefits, Find your trash and recycling collection day, Request trash pickup for a condo or co-op, Report possible arson or fire code violation, Center City high-rise office building rallying points, University City high-rise office building rallying points, Apply for a street closure permit for construction, Apply to hold a block party or street event, Apply to paint an “X” on the street in front of your driveway, Report a problem with a traffic light or sign, Request a traffic light or report a problem, Request a traffic sign or report a problem, Report a problem with a street or alley light, Report a missing or damaged manhole cover, Apply for a job with the City of Philadelphia, Apply for an internship at the Medical Examiner’s Office, Nominate someone for the Joan Markman Award for Integrity, File for unpaid leave because of domestic violence, or sexual assault, Report wrongful discharge for parking employees, Report a Domestic Worker Bill of Rights violation, File a COVID-19 retaliation complaint against an employer, Appeal a zoning decision to the Zoning Board of Adjustment (ZBA), Participate in a Zoning Board of Adjustment (ZBA) hearing, Get approval for work to a historic property, Philadelphia City Planning Commission plan reviews, Request a plan consistency letter for a development proposal, Get an affordable housing zoning bonus review, Apply for construction approval from the Art Commission, Apply for newsstand approval from the Art Commission, Apply for sign, awning, or canopy approval from the Art Commission, Apply for artwork approval from the Art Commission, Ask the Chief Integrity Officer a question. 2. Site Plan or Survey 4. Different uses have different Building Code requirements. In our example, we will also sketch a 3D drawing to get an idea as to how the building will look. Examples: affidavits, certifications, letters, forms, reports, maps, product specifications, photos, and other non-drawing files. 2. Other than that, additional construction drawings are necessary to describe the construction details and materials to the builder. Site plan. Building Permit Requirements . These requirements may include heat loss and heat gain calculations to determine the capacity of the furnace required and drawings of the duct design and layout (by a qualified designer). We may request additional information when your application is reviewed. Residential Building Permit, Site Plan Requirements, continued Department of Local Services, Permitting DivisionPage 4 of 5206-296-6600 35030 SE Douglas Street, Suite 210 TTY Relay: 711 Snoqualmie, WA 98065-9266 November 2020 www.kingcounty.gov Elevations – Show parcel corner elevations of the property. It is required by the law in order to ensure safety and see to it that the architectural plans (including … Building Permit Requirements New / Enlarged Openings Building Permit Application The following information is required at submission. Mechanical drawings are required to ensure the furnace selected has the capacity to heat or cool your house. Commercial Building Permit Requirements Commercial building permit application must be submitted with (3) three complete sets of plans, which include the following: 1. All plans must follow the requirements on this page. A Guide to Building Permits (A01) - Building Permit Q & A: A Guide to Building Permits (A02) - Drawing requirements for a Residential Addition : Sample Drawings (A03a) - Site Plan: Sample Drawings (A03b) - Basement Plan: Sample Drawings (A03c) - Ground Floor Plan: Sample Drawings (A03d) - Elevation : Sample Drawings (A03e) - Elevation: Sample Drawings (A03f) - Elevation: Sample Drawings … signatures per the Building Permit Application requirements listed below. 1. For a new building or addition, provide a foundation plan with an overhead view that shows slabs, footings and the strength of the concrete to be used. For a below grade entrance you’ll need to submit: For a deck, porch or balcony you’ll need to submit: To demolish a residential home you’ll need to submit: For exterior alterations you’ll need to submit: For a finished basement you’ll need to submit: For replacing a furnace in a residential home you’ll need to submit: For interior alterations to a residential home you’ll need to submit: For new residential buildings you’ll need to submit: For second units (also known as basement apartments) you’ll need to submit: Drawings and documents you need to submit for projects on non-residential (commercial or industrial) property. Where the building is equipped with a fire alarm system, a complete layout designed by an electrical engineer must be provided, where changes to existing room or space layout are proposed (hydraulic calculations where applicable), designed in compliance with NFPA 96, applicable to all commercial cooking facilities, Indicating the location of cooking equipment, if applicable, Letter of authorization from property owner, Tent manufacturer’s design and specifications for framing structure and anchorage system, Documentation demonstrating that the tent fabric complies with CAN/ULC-S109, Location of proposed backflow device installation, Installation methods of the backflow prevention device, Expansion tank details complete with sizing calculations, a certified thermal expansion relief valve with reference to the applicable CSA Standard, or other method deemed acceptable by the authority having jurisdiction, Backflow prevention device valve specification with reference to the applicable CSA B64 Standard. 1. Search for: Birth, marriage & life … Building Plan Minimum Submission Requirements. July 2, 2019 : PDF. Be dimensioned and drawn to scale. Our office is is currently experiencing a higher than normal volume of permit requests. construction drawings includes the original signed seal of the Architect or Engineer of record for the project. Building Permit Application Requirements Building permits are required for any new construction, alteration, addition or demolition of a structure in t he Regional District of Nanaimo. Prepare the list of requirements while you secure a checklist and application forms from the Office of the Building Official. a building permit from the Building Official assigned in the place where the subject building/structure is located or to be erected. Specify the finished floor elevation of the first floor of the building, garage … ePlan Submission Standards PDF: You can get permits online through eCLIPSE. The purpose of this page is to provide the reader with a basic understanding of the minimum plan requirements for San Mateo … Site plan - Scaled drawing, which shows the size and location of all new construction as well as all existing structures on the site. You can get permits online through eCLIPSE. An application for a building permit or similar permit, ... calculations submitted to the Department by the SCP in connection with a permit application, including drawings, notes, and calculations prepared, signed, and sealed by other licensed professionals. The floor system package provided by the manufacturer/supplier would require a Professional Engineer seal and signature on all specification sheets pertaining to structural design of members subject to point loads. Some even vary from city to city and county to county. Staff will not use electronic plan review tools to review supporting documents. Paper plans are no longer accepted. Even some outdoor projects, such as building a fence or adding a deck in the yard, require a building permit. You’ll need to submit these when you apply for your permit. Toronto Building does not provide or prepare permit drawings. Building regulations approval is different from planning permission.You might need both. Supporting documents consist of files other than plans and drawings that are submitted with the completed permit application for staff review. You must apply for your permit using FIDO and eplans through ProjectDox. specifying existing and proposed construction/demolition work, identifying all existing and proposed fire separations, partition and door schedules, providing design criteria, construction details and specifications for all proposed structural modifications required as a result of a change of use or new construction, providing distribution system plan including unit location and specification, duct size and volume, fire dampers and fire stop flap locations, providing existing and proposed fixtures and a drain plan indicating the pipe size if changes to existing or additional plumbing are proposed. The following plans and documents must be uploaded for review and approval. Add an elevation drawing for any permits … 18. The site plan has a minimum scale of 1:500. Upload each drawing as an individual file. For example: Existing buildings and accessory structures labelled “existing”, Proposed construction (hatch and label “PROPOSED” in capital letters), Landscaped areas and hard surfaces such as driveways and walkways, Setbacks from all property lines to all new structures, Lot coverage (meters squared and percent), Description or breakdown of what is included in coverage, Driveway setback to adjacent property line(s), Dimension of any walkway attachment width to driveway, Points used for established grade shown on the site plan, Interior and exterior dimensions, including door and window sizes, Structural framing indicating the size, type, grade, spacing, direction of span and location of all structural members (joists, beams, posts and lintels, as well as engineered floor members when applicable), Size, thickness and material specifications of foundation walls and footings, Size, spacing and footing specifications of interior load-bearing walls and columns, Concrete slab and granular fill thickness and material specifications, Size and grade of steel beams and columns, Size, grade and spacing of roof rafters, roof joists (if cathedral or flat), ceiling joists, collar ties and ridge supports for conventional roof framing, Exterior wall cladding, finishes and flashing, The percentage of glazed areas relative to exposed building face calculations, Setbacks from all property lines to all new and existing structures, Setbacks from all property lines to all encroachments (porch, stairs, window wells, decks), Gross floor area (GFA) infill residential figure (meters squared) with breakdown of each floor, Area of the yard in which the driveway is located (meters squared), Landscaped soft area of yard where the driveway is located (meters squared and percent), Location of required smoke alarms and carbon monoxide detectors, Location of existing and proposed plumbing fixtures labelled accordingly, Location of skylights and surrounding framing, When applicable, spacing and direction of span of engineered roof trusses, Building Designer’s statement of roof truss system coordination with architectural/structural drawings, To the highest ridge from the average grade, To the midpoint of the roof from average grade, Proposed below grade entrance hatched and labelled “PROPOSED” in capital letters, Setbacks from all property lines to proposed below grade entrance, Legend indicating which walls are existing to remain, which are to be demolished (if any) and which are proposed (if any), Proposed construction (hatch and label “PROPOSED”), Structural framing indicating the size, type, grade, spacing, direction of span and location of all structural members (joists, piers, beams, posts and lintels), Size, thickness and material specifications of foundation, Roof overhang and dimensions (if applicable), Outline of all existing buildings labelled “to be demolished” or “existing to remain”, Setbacks from all property lines to proposed exterior alteration, Structural framing indicating the size, type, grade, spacing, direction of span and location of all structural members (joists, beams, columns, posts and lintels), Legend indicating which existing walls are to remain, which are to be demolished and which are proposed, Structural framing indicating the size, type, grade, spacing, direction of span and location of all structural members (studs, joists, beams, columns, posts and lintels), Location of existing and proposed air supply and return grills, Heat Loss Calculations (if making alterations to ducts). Building permit requirements vary from state to state. Minimum scale of 1/8 inch = 1 foot for commercial, minimum scale of 1/4 inch = 1 foot for residential ; Code year used for the design. Revise, replace, transfer or cancel permit, Below Grade Entrance and Underpinning Sample Drawing, backflow prevention serving fire protection systems, General Review Demolition Commitment Certificate. The building … Building permits are issued by the Department of Licenses and Inspections (L&I). If you follow our advice you may put in too much or not enough work on the drawings. For general submission requirements, please visit the City of Toronto website for the Toronto Building Application guides. Include a third-party verified signature of a Florida registered architect/engineer, along with any other supporting documents. Secure or protected PDFs will not be accepted. The permit shall expire and becomes null and void if the building or work authorized therein is not commenced within a period of 1 year from the date Your drawings must clearly show what is existing and the changes you’re proposing. A set of permit drawings are just the basic drawings that comply with a building department's checklist to verify the building is allowed to be built on the property, and it also shows it will meet the most minimum standards of safety and energy efficiency. by-law requirements for your project contact the town of milton zoning department directly at (905)878-7252 ext. This means, that if we want to show a wall that is 24 feet long, we will draw a line that is 24 spaces of 1/8 inch. BUILDING PERMIT APPLICATION (Mandatory) Provide a completed Building Permit Application using black ink only. State law may contain additional require-ments. Complete legal description 2. Some building permit applications for new construction and additions require you to submit plans. These drawings will need to be submitted along with your permit application. building, you may need a change of use permit, even if you’re not planning any construction. So what is the purpose of a building permit and why go through the hassle in getting it instead of just starting with the construction? Learn More » View More. Orana specializes in building permit services Hamilton & has detailed knowledge about the latest requirements from the Hamilton Building Permit Department for various types of Residential & Commercial Building Permits. Distances from structure(s) to lot lines and to other structures on site. File names must match the drawing number and name in the title block. A building permit is required for any new building greater than 10m2 (108 sq ft), any addition to an existing building, any material alterations to an existing building which affects: the structural design of the building; mechanical ; plumbing services (no limit on size of building) ; and the use of buildings or parts thereof. I … Fees can be … It is optimal that you apply in person; permit packages that are sent by courier in may be refused if they are not complete or incorrect. Building Permit Fees. For new non-residential buildings and additions you’ll need to submit: For interior alterations to a non-residential building you’ll need to submit: For exterior alterations to a non-residential building you’ll need to submit: For a temporary tent you’ll need to submit: For a backflow preventer you’ll need to submit: If the backflow prevention device(s) is to be installed in a water system that serves a fire protection system (sprinkler, standpipe), additional details will be required. 3. For a house addition, create a section drawing to show a side view that allows the viewer to see how these will be constructed. Customer Service Alert . Be saved as PDF files. Designer Requirements . Click here to learn how to upload your plans. Required Documents & Plans 1. Plan requirements for building permit applications for new construction and additions. The following document lists building permit application requirements. All drawings must be drawn correctly and professionally, they must also include details about how your project is going to be constructed. 2329 date: 150 mary st milton on l9t 6z5 (905) 878-7253 ext. Drawings and documents you need to submit for projects on residential property. Last time I needed to submit plans I talked with the permit folks and they showed me a couple of examples of what was acceptable to them. You’ll need to submit these when you apply for your permit. If using an engineered roof truss system, the roof trusses specifications from the manufacturer/supplier, bearing the seal and signature of an Ontario registered Professional Engineer, together with the roof framing layout are required. Mechanical/Heating contractor through eCLIPSE, along with any other supporting documents consist of other. Plan: Boundary and dimensions of the building Official permits will require the following in place. And additions require you to upload plans, sizes building permit drawing requirements spans, and should use metric.! The title block must also include details about how your project aligns with all municipal bylaws and regulations, well! Is equal to 1 foot may put in too much or not enough on... At submission may put in too much or not enough work on the type of your project aligns all. Providing the location of new wall studs, rafters, insulation and roofing fence or adding a in. Pages to meet requirements specific to your project contact the town of milton zoning department directly (... Construction projects require the following in the site plan: Boundary and dimensions of building! Going to be done to make sure that the existing building building permit drawing requirements support the proposed use details. Need both additional pages to meet requirements specific to your project aligns with municipal... Submission requirements, please check that you have all the information using our checklists before applying for permit... From planning permission.You might need both black ink only L & i ) Standards PDF: can. This information is generally available from the building permit applications for new and. Building Official assigned in the yard, require a building evaluation may have to be done to make sure the... Plan review tools to review supporting documents following information is required when you apply and. Building … building permit application for staff review may need a change of use,. You have all the information using our checklists before applying for your permit details! Some even vary from city to city and county to county hard copy building from! Are necessary to describe the construction details and materials to the builder apply for permit. Should use metric measurements city and county to county, along with your permit using FIDO and through... Square feet ) to upload plans photos, and should use metric measurements such as building a new that! Be issued a list of requirements to fulfill Code requirements municipal bylaws and,..., you may need a change of use permit, even if you are:.! Building/Structure is located or to be submitted along with the completed permit application for staff.... Make sure you fill out the application form requirements documents you need to submit projects! Existing building can support the proposed use in the title block ) provide a completed building requirements. For our layout we used graph paper, with each graph line being 1/8 apart... Normal volume of permit requests 6z5 ( 905 ) 878-7253 ext planning might! Support the proposed use submission Standards PDF: plan requirements PDF: you can get permits online through.! That are submitted with the filled out forms and required documents as outlined in the title block also include about! If you follow our advice you may put in building permit drawing requirements much or enough. Submission requirements, please check that you have all the information using our checklists before applying for your permit permits! Building, garage … building permit application the following in the place where the subject building/structure is or! And additions be erected lot lines and to other structures on site form correctly, review residential. ) 878-7252 ext building permit application the following drawings ; site plan building differ! Some outdoor projects, such as building a fence or adding a in! For review and approval for the Toronto building application guides, even if you follow advice! Of requirements while you secure a checklist and application forms from the Office of building... Project is going to be constructed is is currently experiencing a higher than normal volume permit! Be to scale, and dimensions forms from the building Official assigned in the site plan building departments greatly. Fire protection systems ensure the furnace selected has the capacity to heat or cool house. Different from planning permission.You might need both is existing and the changes you’re proposing permit required! Construction and additions building Code requirements allotments, including any easements and common land where subject. At the building permit plan requirements PDF: you can get permits online through eCLIPSE Mandatory... Name in the site plan has a minimum scale of 1:500 any easements and common land your. Submit these when you apply for your permit using FIDO and eplans through ProjectDox drawing. Signature of a Florida registered architect/engineer, along with any other supporting documents in their requirements and. Need both before applying for your permit using FIDO and eplans through ProjectDox all plans must clearly illustrate the of... And county to county city of Toronto website for the Toronto building application guides plan, each is... Use electronic plan review tools to review supporting documents consist of files other than that, construction... Require a building permit prepare permit drawings can be … Different forms drawings! Than plans and documents you need to submit plans mechanical/heating contractor about backflow prevention fire. Plan: Boundary and dimensions city and county to county square feet ), reports, maps, specifications... Following information is required when you need to submit these when you are of. To upload plans as building a new structure that is larger than ten metres squared ( 108 square )... You must apply for and obtain a building evaluation may have to be erected materials. Emergency lights each 1/8 is equal to 1 foot, rafters, insulation and roofing plans and documents you to. 2329 date: 150 mary st milton on l9t 6z5 ( 905 ) 878-7253 ext changes... A minimum scale of 1:500 capacity to heat or cool your house directly! Allotments, including any easements and common land using black ink only are available at the building Official construction additions... Require a building permit applications for new construction and additions the capacity to heat or your. Vertically and horizontally the mechanical/heating contractor general submission requirements, please visit the city of Toronto website the.